Skip to main content
Waterproofing & Membrane Systems in Randwick, Supcon Group

Waterproofing & Membrane Systems in Randwick

Eastern Suburbs strata postcode mixing 1970s walk-ups, 1990s mid-rises, and 2010-2020 boutique infill.

Waterproofing & Membrane Systems across Randwick buildings

Three distinct build waves all surfacing different remedial profiles at once. 1970s walk-ups: rising damp and facade. 1990s mid-rises: balcony and concrete cancer. 2010s boutique infill: planter-box failures already showing inside 10 years.

The Supcon approach is the same anywhere in Sydney metro: find the source, scope it properly, fix it once. The suburb’s build wave and exposure profile change the diagnosis, not the standard.

Understanding Waterproofing Failures

Waterproofing systems form part of a larger building envelope. When a membrane fails, water rarely appears where it enters.

Instead, moisture can travel through slabs, wall cavities, screeds and structural elements before surfacing elsewhere in the building.

How Supcon scopes it

  1. 01

    Investigation

    Assessment of moisture pathways, membrane condition and contributing defects.

  2. 02

    Diagnosis

    Identification of the source of failure.

  3. 03

    Scope Development

    Preparation of a detailed remediation strategy.

  4. 04

    Membrane Replacement

    Removal of failed systems and installation of compliant waterproofing solutions.

  5. 05

    Protection

    Long-term strategies designed to improve durability and building performance.

Typical Waterproofing Projects

  • Balconies
  • Planter Boxes
  • Podium Decks
  • Roof Areas
  • Wet Areas
  • Commercial Buildings
  • Residential Buildings

Waterproofing & Membrane Systems in Randwick?

Send through the issue with photos. Thomas will walk the building in Randwick, investigate the source, and put a detailed scope of works together. Eastern Suburbs coverage.